Stages of building a private house
Below are the main principles of the construction stages required to build a private house

Consultation on land works

Visiting the territory to verify the quality of the earth after the excavation (approval in the worklog for the continuation of the work)

 

Beginning of construction works – skeleton frame assembly

These are the contractors who assembly the frame of the building from start to finish,

Skeleton frame contractor, foundation pouring, the construction of walls, protected spaces, ceilings, roofs, steps, handrails.

To perform these works, he prepares wooden formwork, produces binding of the rebars according to the engineering plan, produces concrete pouring.

The approval of an engineer in the worklog is required for pouring concrete, the control of a certified laboratory is required by taking samples of fresh concrete (the supervision of the architect on each floor is required)

Contractor for electrical works, laying a main pipeline for power supply and communication (electric company “Hevrat Hashmal”, “Bezeq”, cable TV), laying the required pipeline inside the frame of the building, mainly in the area of protected spaces and ceilings (supervision of the planner is required)

The contractor for plumbing works, laying of a main pipe for water supply and sanitation, in the frame of the building, mainly in concrete walls and on the first floor, laying pipes for drainage of water in the foundation along the perimeter of the basement walls. (supervision of the planner is required)

 

Contractor for insulation and sealing, insulation of fine concrete before laying foundation of the building to prevent future corrosion, sealing the ground floor from contact with the ground, sealing and insulation of basement walls bordering the soil (a warranty certificate must be obtained)

 

Completion of the work on the frame – the beginning of the final works (critical phase)

These are the contractors who carry out the final construction work from start to finish.

Insulating walls and internal partitions

Upon completion of the frame construction and when the building is cleaned of construction debris, customers and an architect are invited to the inner area of ​​the house to mark the inner shell of the house and divide into rooms and living quarters. (Requires permission to continue the work of the contractor in the worklog)

External walls and internal partitions will be built of standard concrete blocks, the first layer will be moistened with hot tar, thermal insulation will be placed in the outer walls, according to the plan (“Randofan” or polyurethane foam). The reinforcement belt is poured over the apertures and partitions above 2.10 m.

 

 

Constructor of aluminum works

Supply and installation of hidden lintels for all apertures. In accordance with the plan and list of aluminum works.

Entrance door Interior doors

Supply and installation of hidden lintels for interior doors, supply and installation of steel door frames for external doors.

Stone or external plaster coating

External cladding system for the building according to the architectural planning of the facade.
The choice of material for the cladding, the execution of samples for approval by the customer and the architect.

Preparation of infrastructure for stone cladding

Repair of concrete walls, application of waterproofing material, weaving of iron grid for preparation for stone facing, facing with stone, processing of openings with stone decor, work on the filling of cracks.

Preparation of infrastructure for internal plastering

Repair of concrete walls, application of waterproofing materials, installation of plaster corners for the building, installation of window sills and application of rough plaster (the final layer of plaster is done with the beginning of painting the building)

External development works

Simultaneously with the completion of the work on the frame it is necessary to carry out external development works of the yard. Castings of retaining walls, fences, external stairs, pathways, concrete pads, preparation of external infrastructures, sewage chambers, water drainage chambers, pipelines for water and energy supply and communications. (The approval of the engineer in the worklog is required on pouring, the control of the architect worklog is required)

Tiled roof and / or roof insulation

Execution of a system of the building roof covering in accordance with architectural planning.
The choice of the building roof covering: tiled or flat roof.

Tile roof

Installation of the main beam, secondary distribution beams, coating and thermal insulation, installation of tiles.

Concrete roof and parapet

Preparation of the roof for a network of slopes, heat and water insulation. 48 hour check for leaks.

 

Finishing works – preparation for internal plastering

Contractor for electricity and low voltage

Installation of central electrical panels and communication panels, laying of power supply pipelines in partitions and walls for electricity, communications, electric shutters, alarm systems, intercom systems, audio systems, smart electricity infrastructure, alarm systems and video surveillance systems, installation of boxes for sockets and switches.

Air Conditioning Contractor

Installation of a “braid” for piping from a condensing position to a vaporizer location, marking openings and transitions, marking power points, control, supervision and drainage for professionals.

Plumbing Contractor

Preparation of transitions and installation of main water pipes, pipelines for solar water heaters, pipelines for heating, preparation of water dispensers, completion of installation of pipes for water supply and drainage inside the frame, connection of pipes to external lines

Skeleton frame contractor

After the completion of the specialists’ work, the concrete is poured to cover the hidden aluminum lintels, waterproofing of the openings is made, and preparations for internal plaster are being carried out.

 

Rough and finished plaster (critical phase)

After the completion of the necessary infrastructure and after the inspection of the clients and the architect, the rough plaster of the surfaces in the building is being carried out, the grid is used to prevent future cracks in the concrete / block joints and above the cuts, plastering of the walls of the protective spaces with special plaster on the basis of the specifications of the Home Front Command. At the end of the rough plaster, covering with a layer of white plaster.

(Supervision of infrastructure inspection consultant is required)

Finishing works – Preparation for floor and walls covering

Contractor for electricity and low voltage

Opening of points covered with plaster, laying electrical lines in the pipeline, laying wires of communication systems in the pipeline, testing and replenishment of missed points.

Plumbing Contractor

Delivery and laying of pipes for hot and cold water for all sanitary installations in the building, installation of dewatering points in wet rooms and kitchens, assembling of hidden flush tanks, checking and completing missing water connections and pipelines to check the pressure and water leakage

Skeleton frame contractor

Concrete pouring over the pipes in the floor, laying thermal and acoustic insulation in the floor, delivery of aggregate for the preparation of the infrastructure of underfloor heating. (Sand-based filler is not recommended).

Underfloor heating contractor

Distribution of heating pipes in accordance with the project, installation of the head of the system at the location of the heating sections, laying the main pipe for the energy center (heat pump, heating furnace, heating system “Junkers”), checking the wiring from the control center (the thermostat)

Skeleton frame contractor

Concrete pouring over the pipes in the floor of the damp rooms, applying cement plaster, applying insulation materials in the floor and the walls, and inspecting wet rooms to prepare for covering.

Waterproofing Contractor

Waterproofing of balconies. Preparation of balconies for the incline system, heat insulation and sealing. 48 hour check for leaks.

(Supervision of infrastructure inspection consultant is required)

 

 Floor and wall coverings (critical phase)

With the completion of infrastructures and after the inspection of clients and the architect, work begins on floor covering and the inner walls facing.

Carrying out of paving works in the inner part of the building, flooring as preparation for parquet covering, external floor paving works on balconies, floors paving works in wet rooms.

Facing internal staircases, installing skirting boards.

Execution of facing works in wet rooms according to the architectural development.
Filling the cracks with “roba”.

(It is recommended to use a layer of acoustic insulation under the floor covering)

Aluminum works contractor

Delivery and assembly of windows, installation of jalousie and connection to switches. Door assembly. Sealing a meeting between the outside and the inside.

(At this stage of construction it is recommended to close the building as much as possible and integrate the protection to prevent damage and theft)

Air Conditioning Contractor

Installation of indoor units in accordance with the project, installation of air conditioning ducts and connections for water drainage. Connection to control sources (thermostats)

Plaster works constructor

Upon completion of the installation of various systems, which required for plaster coating and after inspection of the client and the architect, the following works are performed:

Installation of plaster walls, plaster niches, plaster ceilings, plaster aprons, plaster low ceilings, installation of recessed lighting devices is required.

(It is recommended to use water repellent “green” plaster on all construction sites)

 

Ordering of finishing products – various contractors (critical stage)

At this stage of construction, the delivery of following products must be coordinated:

Main entrance door, internal doors, internal and external lighting fixtures, plumbing and faucets, solar water heater, heating system, air conditioning system, alarm and video cameras, intercom system.

At this stage of construction, the following contractors should be integrated:

  • Carpenter for kitchen cabinets and cabinets for bathrooms and common carpentry for the house.
  • Locksmith for rails, barriers, gates, doors and fences.
  • Carpenter for installation of pergolas and garden parquets.
  • A gardener for gardening and seedling work.
  • Painters.

After the completion of the work on the flooring and the plaster, painting starts.

Preparation of walls, filling of cracks, grouting. Applying a cohesive primer, applying a putty before achieving a uniform texture, use colors and shades chosen by the client and the architect.

Completion of external development work

Simultaneously with the completion of the finishing works, it is necessary to complete the external development work.
Walls covering and filling slots, wooden flooring and laying paths, installing external staircases, scattering of garden soil, installation of sewer hatches, installation of lighting devices.

Beginning of the procedure for obtaining Form No. 4

Upon completion of works on the garden development, it is necessary to proceed with the process of obtaining Form No. 4

 

 

Assembling of plumbing, installation of cabinets for bathrooms and faucets, installation of solar water heater

Assembling and connecting of plumbing and faucets, flushing the main lines, checking the integrity of the system, checking the solar water heater.

Installation of handrails and bars

Assembly of railings and bars for safety, galvanized railings against rust.

Installation of kitchen cabinets and marble countertops

Installation of upper and lower kitchen tables and kitchen islands.

Carrying out measurements for installing marble countertops and wall covering.

Installation of entrance doors, assembly of internal doors, carrying out of internal joiner’s works

Assembling internal doors, installing profiles around doors and handles, carrying out interior carpentry, including various closures.

Final work on electricity and communications

Assembly and installation of electrical panels, installation of electrical switches, installation of lighting devices, intercom systems, alarm and surveillance cameras, control panels for jalousie, for air conditioning and floor heating.

Completion of finishing works

  • Installation of pergolas and garden parquets
  • Garden work, installation of irrigation system and work with seedlings
  • Completion of work in the building
  • Final assemblies, completion of imperfections, systems check, correcting of painting works.

Form number No 4

Submission of forms and approvals to various authorities.

Licensing and supervision representatives field inspection to examine an existing situation against a building permit.
Issuing a  Form No 4

Connecting to electricity and communication networks

After receiving Form No 4 for the building, the authorities claim that it is connected to various systems, to the “Hevrat Hashmal” electricity network, approve conducting of a “test” for building, checks the grounding of the foundations, its isolation and approves the connection to the power grid. Water company – connection of a fixed water meter ready for use.

Form No 5

The final approval of the authorities for the settlement of the building.

 End of the process

 

You have reached the end  of the desired procedure, but this procedure does not end only with reading. Someone has to fulfill it for you. The different concepts of construction, procedures, coordination of various professionals, quality of performance, approval of payments to contractors, etc. This procedure is an integral part of the Company’s services.